Upgrade Archives - School Construction News https://schoolconstructionnews.com Design - Construction - Operations Tue, 14 May 2019 18:38:51 +0000 en-US hourly 1 https://wordpress.org/?v=5.7.11 Atlanta Metro Schools Upgrade Safety Systems https://schoolconstructionnews.com/2019/05/14/atlanta-metro-schools-upgrade-safety-systems/ Tue, 14 May 2019 18:38:51 +0000 http://schoolconstructionnews.com/?p=45613 As students begin to head back to school, safety and security concerns are among some school district officials’ top growing priorities and concerns across the Atlanta Metro area.

The post Atlanta Metro Schools Upgrade Safety Systems appeared first on School Construction News.

]]>
By Aziza Jackson

ATLANTA — As students begin to head back to school, safety and security concerns are among some school district officials’ top growing priorities and concerns across the Atlanta Metro area.

The Fulton County school district, for example, is investing in Avigilon, a high-tech video surveillance system that will be installed in over 105 public school buildings at a cost of $4.6 million, according to the Atlanta Journal-Constitution.

“The basic idea is to have one place to collaborate on emergency situations,” said Paul Hildreth, safety coordinator for Fulton County Schools, to the Atlanta Journal-Constitution. “Safety comes in all forms — weather advisories, traffic alerts, as well as criminal activity.”

In addition to adding video surveillance, emergency alert systems, and more police and safety officers in Atlanta Metro school districts, recent construction projects like those in DeKalb County have incorporated several safety and security features across the district.

Fulton County is reportedly the fourth-largest school district in the state and has the funds for Avigilon’s elaborate system, but safety is an expense for all Metro school districts regardless of size. Some districts, like Gwinnett, Clayton and Henry counties, added more school police officers. Others like DeKalb County, which is Georgia’s third-largest school system, have invested $15 million in safety and security improvements in schools across their district.

Twenty metal detectors will be installed initially in five high schools throughout the district via a pilot program: Cross Keys High School (Region 1), Lakeside High School (Region 2), Stone Mountain High School (Region 3), Martin Luther King Jr. High School (Region 4), Towers High School (Region 5).

DeKalb County is investing $230 million into new facilities and additions, which will include two new elementary schools, in order to counter overcrowding in what is known as the Cross Keys Cluster, according to its website.

According to DCSD board meeting notes, the new construction of school buildings now includes roll-down doors that help to increase security if a non-authorized individual enters the school premises.

A report from the Atlanta Journal-Constitution contributed to this report.

 

 

 

 

The post Atlanta Metro Schools Upgrade Safety Systems appeared first on School Construction News.

]]>
Natural History Building recognized by U.S. Green Building Council https://schoolconstructionnews.com/2019/05/07/natural-history-building-recognized-by-u-s-green-building-council/ Tue, 07 May 2019 19:15:17 +0000 http://schoolconstructionnews.com/?p=46851 The Illinois College of Liberal Arts & Sciences’ Natural History Building has earned LEED Gold certification for energy efficiency and environmentally friendly construction practices in the wake of a recent $79 million renovation.

The post Natural History Building recognized by U.S. Green Building Council appeared first on School Construction News.

]]>
By Aziza Jackson

URBANA, Ill. — The Illinois College of Liberal Arts & Sciences’ Natural History Building has earned LEED Gold certification for energy efficiency and environmentally friendly construction practices in the wake of a recent $79 million renovation.

Originally built in 1892, the Natural History Building reopened in 2017 after a three-year renovation to modernize and add classrooms, laboratories, and study spaces and enhance teaching, research, and collaboration environments. From the beginning of the project, campus officials directed a significant amount of planning and design efforts toward a goal of attaining gold certification, thereby creating healthier and more sustainable spaces to benefit students, faculty, and staff.

The Illinois College of Liberal Arts & Sciences (LAS) Natural History Building renovation received high merits for being conducted in an environmentally efficient manner, with close attention paid to preventing pollution. More than 76 percent of the construction waste was recycled. A large amount of the material removed from the building was reused.

Rapidly renewable materials, such as bamboo flooring, were used in the renovation project. The Natural History Building also received points for water efficient landscaping, energy efficient heating and air conditioning, high levels of daylight for natural lighting, occupancy sensors, and continual energy monitoring.

“Energy efficiency was one of our primary concerns in renovating the Natural History Building,” said Feng Sheng Hu, the Harry E. Preble Dean of the College of LAS. “We are pleased that the U.S. Green Building Council granted us gold certification. In every step of the process, we modernized and expanded the capabilities of this critical building in a sustainable manner.”

The renovation significantly improved water efficiency at the Natural History Building. The building was able to reduce its water usage by at least 20 percent, which is significant given the large number of laboratories and high student traffic in the building. The project also received high marks for using an existing site, having great access to public transportation, and incorporating bicycle parking.

The post Natural History Building recognized by U.S. Green Building Council appeared first on School Construction News.

]]>
NYU to Advance Green Building Projects Throughout System https://schoolconstructionnews.com/2019/04/18/nyu-to-advance-green-building-projects-throughout-system/ Thu, 18 Apr 2019 14:21:03 +0000 http://schoolconstructionnews.com/?p=46746 New York University (NYU) is moving forward with plans to advance sustainable construction and renovation projects throughout its university system.

The post NYU to Advance Green Building Projects Throughout System appeared first on School Construction News.

]]>
By Aziza Jackson

ALBANY, N.Y. – New York University (NYU) is moving forward with plans to advance sustainable construction and renovation projects throughout its university system.

Gerrard P. Bushell, Ph.D., president & CEO of the Dormitory Authority of the State of New York (DASNY), recently announced that NYU issued $862.8 million in bonds through DASNY. The financing will be used in conjunction with previous financings to advance construction and renovation projects throughout the university system. The $862.8 million issued by DASNY on behalf of NYU was offered as $603.5 million in tax-exempt bonds and $259.3 million in taxable bonds.

The issuance includes more than $83 million in Green Bonds providing investors with the opportunity to directly support projects that NYU has identified as environmentally sustainable. Green Bond proceeds will go toward sustainable construction projects and equipment at NYU’s 181 Mercer Street, 370 Jay Street, and the Langone Health Science Building.

“We are excited to have the opportunity continue our long-standing partnership with New York University,” said Bushell. “In working to reduce the university system’s carbon footprint, we are creating more sustainable communities and helping support Gov. Cuomo’s vision for a cleaner, greener New York.”

The proceeds of the issuance will be used to pay for the construction and equipping of a mixed-use building at 181 Mercer Street, which will include dozens of new classrooms, spaces for performing arts education, training, and rehearsals, student and faculty housing, and a replacement sports and recreation facility. The construction will incorporate a variety of sustainable design features such as:

  • Connecting to the university’s high-efficiency, green-house gas and pollutant-lowering Co-Generation (CoGen) facility, which produces electricity, heat, and chilled water
  • Low-flow plumbing
  • Green roofs and outdoor terraces with low irrigation plants to help naturally cool the building, with a retention tank to manage rainwater runoff.

Other Green Bond-funded university system upgrades include:

  • Converting the facility at 370 Jay Street into an innovation hub for engineering, applied and urban sciences, and digital technology and media arts. Restoring the existing façade of the building using high-performance, energy efficient windows, and preserving the neighborhood’s aesthetic character, while significantly reducing the building’s energy footprint
  • Construction and equipping of the Langone Health Science Building, incorporating various green design strategies such as external glass louvers on the south façade to mitigate direct sun and glare, a light-colored roof and paving stones along with vegetated terraces to also reduce energy load and mitigate urban heat island effect, and high efficiency lab equipment.

NYU embraces sustainable building practices, with the vast majority of the 2019 transaction (tax-exempt and the taxable) slated to support green construction and renovation projects. Last year, NYU made a commitment that all new building construction earn LEED Silver designation at a minimum.

“NYU plans to be carbon neutral by 2040,” said Cecil Scheib, assistant vice president for Sustainability. “With DASNY’s support to make sustainable capital projects cost effective here in New York State, NYU can make the most of each construction opportunity.”

The remainder of the Series 2019 bonds financed other projects, including:

  • Upgrades to the university’s CoGen plant to improve energy-efficiency and accommodate increased electricity, heating, and cooling needs related to expansion, the Co-Gen plant substantially reduced NYU’s carbon footprint when it first came on line in 2011
  • Upgrades to infrastructure and renovations at 404 Lafayette Street and 708 Broadway
  • Improvements to academic facilities in Brooklyn for the Tandon School of Engineering
  • Renovations and equipping of space for use by the university’s Chemical Biology Department at the Silver Complex.

The post NYU to Advance Green Building Projects Throughout System appeared first on School Construction News.

]]>