Governor Larry Hogan Archives - School Construction News https://schoolconstructionnews.com Design - Construction - Operations Tue, 14 May 2019 16:56:56 +0000 en-US hourly 1 https://wordpress.org/?v=5.7.11 Building Fund to Initiate $3.5 Billion in Maryland School Construction https://schoolconstructionnews.com/2019/01/17/building-fund-to-initiate-3-5-billion-in-maryland-school-construction/ Thu, 17 Jan 2019 14:40:49 +0000 http://schoolconstructionnews.com/?p=46337 Gov. Larry Hogan recently announced an initiative to make a historic investment in school construction projects across the state. Gov. Hogan unveiled plans for a Building Opportunity Fund and will submit legislation during the 2019 session of the Maryland General Assembly to provide $1.9 billion in new school construction funding over five years.

The post Building Fund to Initiate $3.5 Billion in Maryland School Construction appeared first on School Construction News.

]]>
By Aziza Jackson

ANNAPOLIS, Md. — Gov. Larry Hogan recently announced an initiative to make a historic investment in school construction projects across the state. Gov. Hogan unveiled plans for a Building Opportunity Fund and will submit legislation during the 2019 session of the Maryland General Assembly to provide $1.9 billion in new school construction funding over five years. This proposed new funding is in addition to the $1.6 billion in public school construction funding currently included in the state’s five-year Capital Improvement Program, bringing the total proposed state investment to more than $3.5 billion over five years.

“Education has always been our administration’s top priority and today’s announcement represents the largest investment in school construction – ever – in Maryland history,” said Gov. Hogan. “I believe very strongly that every single child in Maryland deserves access to a world-class education regardless of what neighborhood they happen to grow up in, and an important part of that is making sure that all of our students are educated in facilities that are modern, safe, and efficient which provide them with an environment that encourages growth and learning.”

The new funding will come from revenue bonds funded by casino gaming revenues. The ballot referendum was approved by nearly 90 percent of Maryland voters in the November election, and will result in an additional $4.4 billion in school funding. The referendum specifies “public school construction and public school capital improvement” as one of the targeted uses for this additional funding.

Gov. Hogan will submit the Building Opportunity Act early in the 2019 legislative session, which will provide funding to cover more than 90 percent of the projects requested by local school systems from 2020 to 2024 if enacted. The legislation will give the Maryland Stadium Authority oversight of these additional school construction funds and include accountability measures.

The new construction projects are estimated to create more than 27,000 new jobs over the five-year construction period.

The Building Opportunity Act will be closely modeled after the 21st Century School Buildings Program currently underway in Baltimore City, that is aimed at providing students with the healthy, efficient, and modern school buildings.

The post Building Fund to Initiate $3.5 Billion in Maryland School Construction appeared first on School Construction News.

]]>
Brookdale Community College Updates Flooring Within Tight Timeline https://schoolconstructionnews.com/2015/07/30/brookdale-community-college-updates-flooring-within-tight-timeline/ LINCROFT, N.J. — The Gillespie Group, based in East Brunswick, N.J., recently installed new flooring in the Counseling, Admission and Registration Building at the Lincroft campus of Brookdale Community College. The commercial flooring provider was able to complete the installation within a two-week holiday break before students returned to school.

The post Brookdale Community College Updates Flooring Within Tight Timeline appeared first on School Construction News.

]]>
LINCROFT, N.J. — The Gillespie Group, based in East Brunswick, N.J., recently installed new flooring in the Counseling, Admission and Registration Building at the Lincroft campus of Brookdale Community College. The commercial flooring provider was able to complete the installation within a two-week holiday break before students returned to school.

The previous carpet in the building was severely worn, and the community college administration found it had a tendency to wear when subjected to the amount of foot traffic that the admissions building gets. As the school looked for a more durable type of flooring, they realized several of the potential flooring alternatives required extensive installation times. However, this project needed to be completed in less than two weeks.

The Gillespie Group proposed the school install Nora Rubber Flooring, made from sustainable raw materials. The flooring provides slip resistance, walking comfort and has acoustic values, and can maintain its appearance for more than 20 years. The school ultimately selected the product based on its durability, ease of maintenance and resistance to staining.

“While the initial cost of vinyl tile may be lower than Nora flooring, its lifetime installed cost tends to be considerably higher due to maintenance and upkeep requirements,” said John Gillespie, VP of operations for The Gillespie Group, in a statement.

The greatest challenge on the project was the less-than-two-week timeframe that The Gillespie Group had to install the flooring before students returned from holiday break. The project team worked on some detailed pre-planning to get the work done in time.

“Everything needed for the installation was pre-purchased and staged,” Gillespie said in a statement. “We had everything we needed and in place to begin the project before the students had even left campus.”

The Gillespie Group started the installation process the day students left for break and completed all critical phases of the project before they returned. The final phase, which included the installation of Nora Rubber Treads, was completed over the course of two days without inconveniencing the returning students.

The school administration also awarded The Gillespie Group an additional contract to install Nora Rubber Flooring in the campus’ 1,000-square-foot Campus Security Building.

The post Brookdale Community College Updates Flooring Within Tight Timeline appeared first on School Construction News.

]]>