McCarthy Archives - School Construction News https://schoolconstructionnews.com Design - Construction - Operations Mon, 15 Oct 2018 18:12:12 +0000 en-US hourly 1 https://wordpress.org/?v=5.7.11 Ground Breaks on New Sacramento Elementary School https://schoolconstructionnews.com/2018/10/16/ground-breaks-on-new-sacramento-elementary-school/ Tue, 16 Oct 2018 14:09:35 +0000 http://schoolconstructionnews.com/?p=45768 McCarthy Building Companies, Inc. (McCarthy), a national design-build general contractor, in collaboration with WLC Architects (WLC), a multi-faceted architecture firm, and San Juan Unified School District — recently broke ground on a new campus at Del Paso Manor Elementary.

The post Ground Breaks on New Sacramento Elementary School appeared first on School Construction News.

]]>
SACRAMENTO, Calif. — McCarthy Building Companies, Inc. (McCarthy), a national design-build general contractor, in collaboration with WLC Architects (WLC), a multi-faceted architecture firm, and San Juan Unified School District — recently broke ground on a new campus at Del Paso Manor Elementary. The construction team, along with students, parents, staff and members of the Sacramento community marked the occasion with a “first dig” celebration on campus.

Using a Collaborative Design-Build approach, McCarthy plans to deliver a new campus that consists of two classroom buildings and a third administration building that will include a kitchen and flexible, multipurpose space to accommodate the shifting needs of the students and staff. Flexible furniture, multiple writing walls and open spaces for collaboration are key features throughout the facility. A new off-street driving lane for student pick-up and drop-off will also be included to provide additional safety and alleviate road congestion during peak traffic times. Funding for the campus upgrades are supported by Measure P, which voters approved in 2016.

Reflecting the district’s focus on collaborative learning with the Collaborative Design-Build delivery model, the team ultimately arrived at a solution that embraced the end-user and school administration goals established. As part of the school’s recent Open House festivities, McCarthy unveiled a preview of the updated design with a virtual reality walkthrough, which was received with enthusiasm and excitement from students and parents.

“Del Paso Manor is a cornerstone component of the neighborhood, and we worked closely with the broader community to determine the overall needs and features that would best serve all of the project’s end-users,” said Senior Project Manager Andrew Dessling with McCarthy. “The upgrade to all new facilities allows the district to truly support its educational philosophy that ensures students reach their highest academic, social and intellectual potential in a modern, safe environment.”

Construction will begin on October 15, 2018.

McCarthy Building Companies, Inc. is the oldest privately held national construction company in the country, and the firm has offices in St. Louis; Atlanta; Collinsville, Ill.; Portage, Ind.; Kansas City, Kan.; Phoenix; Las Vegas; Denver; Dallas, Houston; Albuquerque; San Diego, Newport Beach, San Francisco, San Jose and Sacramento, Calif.

The post Ground Breaks on New Sacramento Elementary School appeared first on School Construction News.

]]>