Eppstein Uhen Architects Archives - School Construction News https://schoolconstructionnews.com Design - Construction - Operations Tue, 18 Jun 2019 16:00:33 +0000 en-US hourly 1 https://wordpress.org/?v=5.7.11 Pope Farm Elementary School Breaks Ground in Wisconsin https://schoolconstructionnews.com/2019/06/19/pope-farm-elementary-school-breaks-ground-in-wisconsin/ Wed, 19 Jun 2019 15:57:36 +0000 http://schoolconstructionnews.com/?p=47072 Middleton-Cross Plains Area School District (MCPASD) broke ground recently on the new Pope Farm Elementary School. Battling overcrowding at multiple schools, Eppstein Uhen Architects (EUA) worked with the District to design a future-ready school that embodies MCPASD’s mission: Inclusive.

The post Pope Farm Elementary School Breaks Ground in Wisconsin appeared first on School Construction News.

]]>
By SCN Staff

MILWAUKEE—Middleton-Cross Plains Area School District (MCPASD) broke ground recently on the new Pope Farm Elementary School. Battling overcrowding at multiple schools, Eppstein Uhen Architects (EUA) worked with the District to design a future-ready school that embodies MCPASD’s mission: Inclusive. Innovative. Inspiring.

Set adjacent to an expansive conservancy, the design concept for Pope Farm Elementary School reinforces a connection to nature. With a variety of spaces to foster small- and large-group instruction, the school’s design is the result of extensive collaboration with teachers and staff.

“We are excited to kick off construction at Pope Farm Elementary School” said Project Manager Robin Savola. “The safe, functional environments within Pope Farm Elementary School will support learners of all kinds, enhancing their reputation as a destination district.”

The new 525-student elementary school is part of a larger District building project made possible by a successful $138.9 million referendum approved by voters in November 2018.

Additional projects include:

Renovate and expand Middleton High School; Clark Street Community School will be included in the high school addition/renovation project

Add a cafeteria and areas of light interior renovation at Park Elementary School

Convert the current Clark Street Community School building into a 4K-early childhood site

Pope Farm Elementary School is set to open for the start of the 2020-21 school year. J.H. Findorff & Son is the Construction Manager on the project.

Eppstein Uhen Architects (EUA) is best known for designing environments that elevate people’s potential. More than 230 employees in Milwaukee, Madison, Des Moines and Denver demonstrate unparalleled commitment to the markets, communities and clients they serve. The respected 112-year old firm specializes in several markets including education, workplace, healthcare, senior living, student housing, mixed-use, entertainment and science + technology. For additional information, please visit the firm’s website at eua.com.

The post Pope Farm Elementary School Breaks Ground in Wisconsin appeared first on School Construction News.

]]>
Wisconsin Elementary School Celebrates Completed Renovation https://schoolconstructionnews.com/2018/09/14/wisconsin-elementary-school-celebrates-completed-renovation/ Fri, 14 Sep 2018 14:19:00 +0000 http://schoolconstructionnews.com/?p=45682 There will be a dedication ceremony and open house for the new addition and newly renovated areas of Ixonia Elementary School, on Sunday, Sept. 23.

The post Wisconsin Elementary School Celebrates Completed Renovation appeared first on School Construction News.

]]>
MILWAUKEE — There will be a dedication ceremony and open house for the new addition and newly renovated areas of Ixonia Elementary School, on Sunday, Sept. 23. Designed by Eppstein Uhen Architects and built by Nicholas Construction, Ixonia Elementary students, staff and families will celebrate the completion of the school construction project, made possible by the community’s support of the 2016 referendum.

Oconomowoc Area School District (OASD) staff, families and community members are invited to join the festivities, acknowledgments, self-guided tours and student participation at the event.

Ixonia Elementary School Principal Stacy Yearling said in a statement, “Walking into the new Ixonia School, it is evident that this project has been about far more than just new spaces and walls. The committees of people that have poured their energy into making so many important decisions, both large and small; the volunteers that have committed their time, energy and hearts into helping to make this project come to fruition; the educators who have embraced the challenge of teaching in a space over the last year and a half that was in a constant state of revision; and the families that have shown unending support for our school.”

The interior of the new Ixonia Elementary School addition was completed during summer break after the 2017-18 school year ended. Space includes new 4K and 5K classrooms, a new cafeteria/commons area, new offices and a new secure main entrance. Immediately after school ended in June, major work shifted into the original building. The project also includes renovated 1st-4th-grade classrooms on the main level and Maker-Space and STEM learning areas on the lower level, plus a new outdoor play space.

Demolition was completed quickly, and crews began framing new walls in the lower level, cutting openings between classrooms on the main level, and updating plumbing, electrical, heating/cooling and fire protection systems. Exterior concrete work to create the new main entrance, sidewalks and curbs also began in June, in preparation for paving the new bus-loop in July and final landscaping in August.

The post Wisconsin Elementary School Celebrates Completed Renovation appeared first on School Construction News.

]]>