Frozen state funds thawed
Construction of the career/technical unit building 700 at Liberty Ranch High School is in full swing. Thanks to a thaw in frozen new school construction funds from the state, the district will now be able to pay off a $2 million bridge loan taken in December 2009 to finish the building.