RISD Breaks Ground on Long-Awaited Residence Hall
Shawmut Design and Construction joined the Rhode Island School of Design (RISD) to break ground on the institute’s first new student residence in 30 years.
Read moreShawmut Design and Construction joined the Rhode Island School of Design (RISD) to break ground on the institute’s first new student residence in 30 years.
Read moreBOZEMAN, Mont. — Montana State University (MSU) recently announced that its first energy savings performance contract (ESPC) has exceeded its projected energy savings by more than 15 percent.
Read moreYERINGTON, Nev. — Nevada’s fourth largest school district, Lyon County School District in Yerington, Nev., has entered into an Energy Savings Performance Contract that is expected to save the district $345,000 annually for 15 years.
The district signed the $3.6 million ESPC with Framingham, Mass.-based Ameresco, Inc., an energy efficiency company that has worked on renewable energy solutions for facilities throughout the country. The contract will focus on infrastructure upgrades to 19 schools and four administrative buildings that serve over 8,400 students.
Read more